Before
After · Fendix installed
Floor waste incorrectly installed through a stack cast-in, rectified with Fendix.
A floor waste had been installed through a cast-in intended for a stack. Fendix was fitted over the existing collar to rectify the issue and make the penetration compliant.
What was rectified
The existing cast-in collar was intended for a stack application, while the installed service was a floor waste. Fendix provided the assessed retrofit solution over the existing collar.